2000/08/23 Preparation building foundation
2000/10/30
2001/02/19
2001/07/31 Completion
Construction work sequence
Instllation of 150tf overhead crane(2001/04/25)
Preparation Building
Equipped with a 150-tonf overhead crane, and used for the preparation of test models.
Area : 2,200 m2 Height : 29 m.