Process of shaking table blocks welding |
2003/06/13 |
 |
15m wide shaking table |
2003/06/13 |
 |
Upper plate welding of shaking table blocks |
2003/06/13 |
 |
Memorial planting in opening ceremony
|
2003/07/01 |
 |
Opening ceremony for facility building |
2003/07/01 |
 |
Representative of MEXT speech in celebration ceremony for end of construction |
2003/07/01 |
 |
Dr. Hayama's speech(Director of NIED) of celebration ceremony party for end of construction |
2003/07/01 |
 |
Operation building roof |
2003/07/04 |
 |
| Process of shaking table blocks welding |
2003/07/23 |
 |
Shaking table blocks welding and shaking table pit |
2003/09/19 |
 |
| Gate monument |
2003/09/19 |
 |
Soil drainage ditch |
2003/10/17 |
 |
Preparation building front yard |
2003/10/17 |
 |
Servo-valve unit installed on the side of each vertical actuator |
2003/10/17 |
 |
Guide boad |
2003/10/17 |
 |
Operation imformation screen |
2003/10/17 |
 |
| Shaking control system in measurement and operation room |
2003/11/14 |
 |
Shaking control system in measurement and operation room2 |
2003/11/14 |
 |
Shaking table displacement observation system |
2003/11/14 |
 |
Front yard |
2004/01/09 |
 |
E-defense technical committee members climb on the welded shaking table to visit the fabrication process |
2004/01/22 |
 |
Horizontal actuators trial driving |
2004/01/22 |
 |